Bar Room Boozin it up The Mad Hammer | December 25, 2009 Beings I have to have all the wiring run to get my rough in inspection done, that meant accelerating the bar room. When we last left it, I Read More
General Shocking, I know… The Mad Hammer | December 25, 2009 Been a while since I’ve updated, but I’ve been busy while silent. 🙂 Shortly after getting the insulation mostly in, I obtained an estimate to have the subpanel Read More