Boozin it up
Beings I have to have all the wiring run to get my rough in inspection done, that meant accelerating the bar room. When we last left it, I only had half of one wall drylocked. I’ll say that that stuff will keep in the big 5 gallon bucket for a pretty long time! It has been over a year since I last opened it, and after a good stirring (read: after spraying the $h1t all over the place) with a bent up coat hanger in a drill, the rest of the walls were coated. I had just enough left over out of the whole bucket to do about 1-2 more square fit, the man-cave gods smiled upon me!
After another lumber trip (thanks for use of the van wifey!) and a side trip to borrow a kickass nailer from a friend of mine, the two walls went up with ease! Yes, that is a level, and yes I used it! 😛
Related Posts
-
Oak-ie dokie pokie…
No Comments | Jan 8, 2012
-
Bustin (end) caps
No Comments | Dec 26, 2012
-
All flights cancelled…
No Comments | Feb 25, 2012
-
Come on baby light my baaarrr…
No Comments | Jul 29, 2012